This semi-fixed dosing plant has a production capacity of 52 yd³ per hour.
The installation time is 72 hours. Delivery Estimated time: 5 weeks to be assembled on site with initial work tests. Land must be firm or have a concrete template. This equipment is delivered ready to work in which your booth will be used for control and dispatch, as well as the 220 Volts power supply. The Aggregate Materials scale is supported with electronic load cells with a capacity of 15 ton. of aggregate material (10 yd³) with pneumatic gates electric vibrator of 0.5 hp for eviction of bonded materials in to two sections for separation of aggregate materials. 60 tons cylindrical cement silo. 65 yd³ capacity with man step gate, access ladder to the top as well as an internal scale for maintenance and atmospheric venting system. |
DEOS 70
24” wide aggregate conveyor belt and 10 HP motor reducer. Three layered rubber of 3/16 top 1/8 bottom with two textile layers.
Cement scale with 2.5 tons capacity. with pneumatic aeration system and an 8” diameter pneumatic butterfly gate, supported with load cells 2 tons capacity (3). Electric motors fully enclosed and fan cooled. 5 HP air compressor. And 300 liters tank. Force board with MCA contactors. Siemens control transformer, and motor guards built into the dosing plant, all the force wiring is heavy duty, and it is delivered assembled. |
DRY BATCH PLANT
Pneumatic control equipment is divided into two boards strategically placed in the requirement zones, high pressurized pipe, in main lines. High density polyurethane in distribution of the equipment.
A Water scale with a capacity of 2000 liters and a 3” water pump of Ø 5 hp for dosage load. 1 HP Water pump for filling truck service tank. Chassis, Transport shaft, Rolled 22.5 pneumatic brake system. |
WET BATCH PLANT
Control panel with electronic indicators and push buttons to open gates, for starting engines separated from the plant by means of cable control (25 meters).
This dosing plant is manufactured in A-36 steel under Mexican quality standards surpassing those demanded by our competitors in the USA. This equipment is manufactured for a production of 105 yd³ according to the standards of CPMB. |